Project Description
The project replaces Cowles Bridge carrying Southwick Road (Routes 10/202) over the Little River. The drawings include a conceptual phasing plan that will allow traffic to utilize the existing bridge while the new bridge is constructed. The project includes a realignment and widening of Southwick Road to provide turning lanes at City View Road and Mill Street. The City View Road traffic signal will be replaced and a new traffic signal is proposed at the intersection of Mill Street. Both the design and construction of the project are funded by MassDOT.
Schedule
The project is currently (July) advertised for bidding with an anticipated construction start later in 2020. We will provide schedules as the project advances.
Drawings
The Construction Drawings can be viewed here:
Construction Drawings
Design Public Hearing Presentation
Updated drawings presented at the meeting can be viewed here:
Dec 13th 2018 Drawings
The Powerpoint slides presented at the meeting can be viewed here:
Dec 13th 2018 Presentation