This project includes roadway realignment and new pavement and curbing, dedicated turning lanes, new crosswalks, traffic signal improvements, an 8- to 10-foot shared use path along the west side of the right-of-way, sidewalk improvements along sections of the east side, utility pole relocation, and drainage improvements. The southern project limit is the north side of the I-90 Interchange, and the northern project limit is the intersection of North Road. Traffic signal improvements included in this project are located at the following intersections: North Road, Medeiros Way and Falcon Drive, and Servistar Industrial Way. The 25% design submission package was received as of 7/20/2021. A timeframe for construction is yet to be determined at this time.
25% Design Submission Plans