Feasibility Study - Multi-Use Trail Connector

This feasibility study is for a multi-use trail connector from the Columbia Greenway Rail Trail at Women's Temperance Park north past I-90 to Southampton Road/Route 10/US 202. The study will require public outreach and involvement through several meetings and a survey; it will identify design criteria and trail route alternatives; it will determine final trail route alternatives' plans and costs; it will recommend a preferred design alternative; and finally, it will produce a final feasibility study. The timeframe on this feasibility study is to be conducted now through Winter and Spring 2022, with a completion by June 2022.

Public Meeting #1, November 17 @ 6pm, Online via Zoom